The highest clad-rack warehouse built by POLYPAL
Customer
Insud Pharma is a pharmaceutical group with over 45 years of history and a presence in more than 50 countries. It has 18 production plants and 15 R&D centers.
It operates across the entire pharmaceutical industry value chain, offering specialized expertise in scientific research, development, manufacturing, sales, and marketing of a wide range of active ingredients and medicines.
Need
The company has experienced strong growth in recent years, thanks to various industrial portfolio development projects, entry into new markets, and business ventures. These reasons have led Insud Pharma to increase its storage capacity.
Solution
The pharmaceutical group chose to build a clad-rack warehouse in Azuqueca de Henares (Guadalajara). In this type of warehouse, the racking not only stores the goods and supports the loads, but also the structure of the walls and roof, avoiding civil construction of an industrial facility. This reduces execution times and costs compared to a traditional warehouse.
POLYPAL fitted out this automated clad-rack warehouse to store strapped products with a capacity of 29,568 pallets. The facility occupies a surface of 3,000 m2, with a height of 43 metres, length of 96 metres and depth of more than 30 metres width. The warehouse is operated by double and single-deep stacker cranes that travel the length of the warehouse aisles performing the functions of goods reception, location and dispatch.
Technical data sheet
- Clad-rack warehouse with stacker crane
- Total height: 43,000 mm
- Load capacity: 29,568 pallets
- Maximum weight per pallet: 1,050 kg
- Strapped products storage
The clad-rack warehouse has a height of 43 metres, equivalent to a 14-storey apartment block, and is operated by double and single-deep stacker cranes.
Are you interested in any of our products?
Tailor-made solution
If you are not sure which storage solution best suits your needs, please contact us. We will help you get your project off the ground.

